Commercial Concrete in Fresno
We pour walkways, service yards, equipment pads, entry slabs and concrete repairs for schools, businesses and property managers. On sites that stay open during the work, we schedule around the hours the space is in use and close off only the area being poured.
This summer we poured at school campuses in Parlier. The work included a service yard pad, walkways along a classroom wall and a playground fence, and a slab between two older sections at a gate. The playground walkway was formed before dawn so it could be poured and taped off before school started.
Commercial Concrete Services We Offer
- Campus and site walkways
- Service yards and equipment pads
- Sidewalk and slab replacement
- Trip hazard repair
- Entry aprons and door landings
- Dumpster and mailbox pads
Who We Work With
Schools and districts
We schedule campus work around the school day and school breaks. Finished slabs are taped off while they cure, and a walking route stays open around them.
Walkways near classrooms and playgrounds must meet accessibility requirements for slope. New slabs are set level with the paving around them.

Property managers and HOAs
We repair lifted sidewalk sections, entry walks that hold water, and broken mailbox and dumpster pads. On occupied properties, the work is done one building at a time.
Quotes are written per property and itemized by building.

Retail, office and church
We pour entry aprons, walkways from the parking lot and patio slabs. These jobs are usually scheduled for hours when the building is closed.
New finishes are matched to the existing concrete on site.

Yards and industrial
Service yards, equipment pads and approach slabs carry heavy vehicles, so the thickness, reinforcement and base are sized for the load. The Parlier yard pad was poured over wire mesh on a compacted base.
Large yards can be poured in sections so part of the yard stays in use.

Schedule for a Commercial Pour
New concrete can take foot traffic after 24 to 48 hours and vehicles after about a week. It reaches full strength in about 28 days. We give you the dates for each slab before we leave.
We meet with the building manager, agree on the hours the area can be closed and put that schedule in the quote.
We remove the old concrete, cut and compact the base, and set the forms and steel.
The slab is poured, finished and jointed. Most of these pours are done in one morning.
Barricades come off the walking surface.
The slab can carry trucks and equipment. We return for a final walk-through and remove anything left on site.
What to Check on a Commercial Concrete Bid
These four items should be covered in any commercial concrete bid.
Walkways that serve a building have limits on cross slope and running slope. We check the grades before the forms are set.
A new slab has to sit level with the paving next to it. The gate slab in Parlier was set flush with the sections on both sides.
Joints are placed so cracks form along them. Joint spacing matters most on yards that carry trucks.
When and where a concrete truck can reach the site affects the schedule. Both are written into our quote.